Stage 1
Before site
Completion strategy, system breakdown, test plans and the evidence model agreed up front, so everyone knows what complete looks like.
Specialist support across the completion lifecycle: project and package management, systems completion, commissioning, handover, quality, technical assurance, information management, operational readiness and nuclear assurance.

1 / 8Project and package management provides the structure, coordination and control needed to move defined scopes of work from planning through to completion. It establishes clear boundaries, manages the interfaces between contractors and disciplines, and maintains visibility of progress, risk and readiness at every stage.
2 / 8Integrated systems completion re-frames a project from areas and disciplines into the systems and sub-systems that must be verified, energised and handed over. It defines what 'complete' means for each system and the evidence required to demonstrate it.
3 / 8Commissioning and handover is where a project proves it works. It requires a clear sequence, disciplined control of the transition from construction to commissioning ownership, and evidence that each system performs as intended.
4 / 8Quality assurance gives confidence that the work delivered meets the requirements set for it. It covers how quality is planned, how it is verified during execution, and how the resulting records demonstrate compliance.
5 / 8Technical assurance confirms that what is being designed, built and completed will meet the technical requirements and the intended purpose of the asset. It looks beyond process compliance to whether the engineering outcome is correct.
6 / 8Completion is more than construction. Without accurate, coordinated documentation a finished asset cannot be accepted, operated or maintained with confidence. Information management ensures the right records exist, are controlled and are ready when needed.
7 / 8Operational readiness asks a simple question: when the project finishes, can the asset actually be operated and maintained safely and effectively? Answering it requires a structured look at people, processes, systems, spares, training and information.
8 / 8Projects in nuclear environments carry heightened expectations for quality, compliance and evidence. Every element of delivery, from procurement to completion records, must be demonstrable and traceable.
Services can be commissioned individually or combined into a single assurance and completion package aligned to your programme.
Agree the packages, systems and outcomes that need support.
Set evidence, quality and technical assurance requirements.
Drive systems completion, commissioning and testing.
Deliver accepted, documented and operationally ready assets.